Get involved!

You are invited to learn more about these applications and share feedback online. The following engagement opportunities are open from March 10 until March 23, 2025.

  • Learn More about the applications, how feedback is used and next steps
  • Ask a Question to the Project Planner any questions you have about the applications
  • Share Your Thoughts about the applications

What Happens Next

We will use feedback shared to make sure our review of the applications are as complete as possible. After engagement is closed, feedback received will be summarized in a What We Heard report for City Council so that they know your perspective prior to making a decision.

Learn More

The City has received two rezoning applications from BM Homes Ltd. on 76 Avenue NW, west of 116 Street NW. One is at 11607 - 76 Avenue NW (LDA25-0002) and one is at 11618 - 76 Avenue NW (LDA25-0003). While there are other similar applications in the Belgravia/McKernan neighbourhoods, this online engagement is only about these two. That said, there is some information on this page that could also be applied to other applications.

Image of proposed rezoning along 76th Avenue for RS to RSM h12.0 & RS to RM h16.0


The current zone on both lots is the Small Scale Residential Zone (RS). The proposed zone for 11607 - 76 Avenue NW is the Medium Scale Residential Zone (RM h16.0) and the proposed zone for 11618 - 76 Avenue NW is the Small-Medium Scale Transition Residential Zone (RSM h12.0). Initially, the RM h16.0 Zone was proposed for both lots, but after initial feedback from the City, the applicant chose to change to the RSM h12.0 for the lot further west.

Below is a table comparing key differences about the current and proposed zones.


RS Zone
(Current)

RSM h12.0 Zone

11618 - 76 Avenue NW

RM h16.0 Zone
11607 - 76 Avenue NW

Maximum Height

10.5 m

12.0 m

16.0 m

Maximum Floor Area Ratio

N/A

N/A

2.3

Maximum Site Coverage

45%

60%

N/A

Number of Dwellings

No minimum

Maximum:

- 11618 - 76 Ave - 8

- 11607 - 76 Ave - 7

(75 m2 of site area per dwelling)

Minimum - 3
No maximum

Minimum - 3
No maximum

Minimum Front Setback (76 Avenue)

4.5 m

4.5 m

3.0 m

Minimum Side Setbacks

1.2 m

1.2 m

3.0 m
1.5 m (if height 12 m or less)

Minimum Rear Setback (Alley)

10.0 m

5.5 m

3.0 m

Commercial Uses

Not allowed

Not allowed

Limited, ground floor only.


Below are visual representations of the potential built forms allowed under the current and proposed zones. It is important to note that these are not the only options for development under these zones, but are generally considered the maximum build out. Two options are shown for the RM h16.0 Zone because the developer may be more inclined to seek a lower height in order to reduce the side setback requirement, as shown in the table above.

Current RS Zone

Massing model of current zone of 11618 - 76 Ave NW & 11607 - 76 Ave NW

Proposed RSM h12.0 Zone and RM h16.0 Zone

Massing model of proposed zone of 11618 - 76 Ave NW & 11607 - 76 Ave NW

Proposed RSM h12.0 Zone and RM h16.0 Zone (12 m height option)

Massing model of proposed zone of 11618 - 76 Ave NW & 11607 - 76 Ave NW (12m height option)

A Land Development Application (LDA) will be submitted when a developer wants to complete a build on a piece of land that does not currently allow for that kind of build. The LDA proposes a change in zoning, which are the rules for what can be built on the land. Only City Council has the authority to change zoning through a bylaw. The LDA process creates a bylaw for Council’s consideration and, if approved, the rules (zoning) for what can be built on the land are changed.

There are three main groups who facilitate the Land Development Application process:

1) Developers (the Applicant) will submit a Land Development Application (LDA) when they intend on starting a development on a piece of land not currently zoned for their desired build.

2) City Planners (the Project Team) will receive this LDA from the applicant. They will coordinate a review by many different experts from within and outside City Administration to develop an overall recommendation to City Council. This review includes technical and legal aspects as well as a comparison of the proposal with Council approved policies and planning principles. They will also initiate a public engagement process, with support from other City staff. This engagement process will collect feedback from Edmontonians who may be impacted by the rezoning. More information on how this process works can be found in the ‘How is the feedback collected on this page used?’ section below.

3) City Council (Decision Makers) are the final decision makers on whether or not an LDA bylaw will be approved, thereby rezoning the land. They will make this decision at a Public Hearing. In this Hearing, City Planners will present the LDA to Council, outline their planning analysis and share a summary of engagement feedback. The developer may also be in attendance to present their proposal and answer questions from Council.

The public has two main points that they can provide feedback on a proposed LDA:

1) Public Engagement with City Planners - the public are able to provide feedback directly to City staff while the Land Development Application is in the engagement phase before it is brought to council. That feedback will be shared with Council in summary form, which will provide necessary context for their decision making.

2) Council Public Hearing - the public may register and attend the Public Hearing about the LDA. Here, they can speak directly with council and share their thoughts, before the vote is cast.

The City Plan calls for more intense forms of development to follow a network of nodes and corridors. This area of the City falls under the Scona District Plan, with the District Policy also being applied. In the Scona District Plan, the sites are located in the Urban Mix, within 100 metres of the 76 Avenue Secondary Corridor. Both sites are along the Collector Roadway of 76 Avenue NW with one being within 400 metres of the McKernan/Belgravia LRT Station and one not (see image below).

Map showing the location of the rezoning sites relative to applicable planning policy criteria along 76 Ave & 114 Street



There are three main policies from the District Policy that apply to these applications:

Policy 2.5.2.4 - Support Small Scale housing in Urban Mix areas outside of Nodes and Corridors.

Policy 2.5.2.5 - Support Low Rise development (residential, commercial or mixed use) in locations outside of Nodes and Corridors that meet at least one of the following criteria:

  • On corner sites at the edge of the neighbourhood where the block face fronts onto an Arterial Roadway or Collector Roadway,
  • On or adjacent to sites zoned for greater than Small Scale development or for commercial or mixed use development and along an Arterial Roadway or Collector Roadway, or
  • Within 400 metres of Mass Transit Stations and along an Arterial Roadway or Collector Roadway.
Policy 2.5.2.6 - Consider additional scale in locations that meet at least two of the following criteria
  • In a Node or Corridor Area or within 100 metres of a Node or Corridor Area,
  • Within 400 metres of a Mass Transit Station,
  • Along an Arterial Roadway or a Collector Roadway,
  • At a corner site or adjacent to a park or open space,
  • Adjacent to a site zoned for greater than Small Scale development.
The proposed RSM h12.0 Zone would facilitate a more intense form of approximately 3 storey “small scale” housing while the proposed RM h16.0 Zone would allow for approximately 4 storeys and would be considered “low rise” in the District Policy.

The role of the public when participating in engagement activities for proposed rezonings is at the ADVISE level of the City’s Public Engagement Spectrum. This means that the City will use any feedback you share to:

  • Inform the City’s planning analysis and ensure all factors are taken into consideration
  • Help inform conversations with the applicant about making revisions to address concerns
  • Summarize feedback for City Council so they are aware of the public’s perspectives prior to making a decision at Public Hearing

A What We Heard report that summarises the feedback received is posted online and provided to the Ward Councillor as well as anyone who registers and provides feedback through this page or by contacting the file planner directly.

City planners use the Public Engagement Charter for rezonings as a guide when determining what type of engagement activities are most appropriate to help inform rezoning proposal reviews


Please Note: Because standard zones apply to multiple sites across the city, the City cannot adjust or customize the individual regulations within these zones. When rezoning to a Direct Control zone (DC), there is opportunity for public engagement to influence adjustments to the proposed site specific regulations because these zones are only applied to a specific site or area.

Public Hearing

Once Administration completes its review and has determined its recommendation and the applicant is ready to take the application to City Council for a decision, the City sets a Public Hearing date. Notices are sent to all property owners within a minimum of 60 metres of the site in accordance with the Zoning Bylaw. In addition, notices of Public Hearing are sent to affected community leagues and business associations advising them of the Public Hearing date and how to participate.

Register to Speak to Council or Submit Comments

Public Hearings are an important part of the engagement process for rezonings. Once the hearing agenda is posted, members of the public can register to speak at the City Council Public Hearing to share their views on the proposed rezoning directly with the Council.

Written comments can also be submitted to City Council through the Office of the City Clerk. Edmontonians can also watch the Public Hearing online.

If the Application is Approved

If the rezoning is approved by Council, the next step is for the developer to apply for development and building permits to start construction. Timelines for submitting these applications and starting construction are typically at the developer’s discretion.

Ask a Question

Ask Us Questions About The Application

Submit a question below to the file planner or see what others have been asking. Answers are posted within 5-10 business days. When needed, we will also work with the applicant to provide an answer.

Please note you must register on Engaged Edmonton to ask a question.

Please ask a question below that will go directly to the City file planner who is processing the application.

If you are unable to provide feedback on this site, you may also provide feedback to the Project Planner directly via the contact information under the "who's listening" section of the page. Please avoid asking your question in two different places, such as emailing the planner as well as posting on this site. It is not necessary to do both in order for feedback to be captured, and may delay response times.

Provide a short summary of your question.

You have 150 characters left

Provide detailed information relating to your question.

You have 500 characters left

Select a respondent from the list that you would most like to answer your question.

Moderation Policy

These are the people that are listening and responding to your questions.

Andrew McLellan

Principal Planner

{{ question.username }} asked

{{question.description}}

{{ answer.respondent.name }}
| Edited

Answer this question

Select the respondent who will be marked as answering the question

Provide the answer to the question. Answer can be saved as draft and published when complete.

No questions found

Share Your Thoughts

Tell Us What You Think About The Application

Please let us know what you like and what could be better about this application. What should Council know as they decide whether or not to approve the rezoning? Other people that visit this part of the site will be able to see your comments.

Please note you must register on Engaged Edmonton to provide feedback. Only your username will be displayed publicly, all other contact information is kept confidential. All comments go through an automated moderation process.

If you are unable to provide feedback on this site, you may also provide feedback to the Project Planner directly via the contact information under the "who's listening" section of the page.

Please avoid providing your feedback in two different places, such as emailing the planner as well as posting on this site. It is not necessary to do both in order for feedback to be captured and may delay response times.

Share Your Thoughts on the proposed Land Development Application. Please refer to Learn More tab for more information and materials pertaining to the discussion topic.