Boyle Street & McCauley Neighbourhood Renewal - Options and Tradeoffs

Engagement has concluded. Thank you for providing your feedback. 

Neighbourhood design options are taking shape! Share your thoughts!

We have many proposed design options that will change the way you move through your neighbourhood. Please provide feedback on those that interest you.


NEW! Bike Network Connections and Street Changes (posted September 1, 2021)

Review the proposed NEW design options for bike routes and street changes, along with their benefits and tradeoffs, and provide your feedback through our online survey until September 30, 2021.

These new designs include options for the following:

Bike Network Connections; 108 Avenue and 108A Avenue (92 to 96 Street); 92 Street (103A to 111 Avenue); 96 Street (105 to 111 Avenue); 98 Street (105 to 110A Avenue); 99 Street (106 to 108A Avenue)


Online Event

Watch the video from our September 14 online event to learn more about the newest design options.



If you have not yet reviewed and commented on the following design options posted July 2021, please consider doing so before September 30, 2021:


Active Transportation and Alley Connections

Review the proposed improvements to active transportation connections and Chinatown's alleys.

Active transportation and alley connections design

You can provide feedback on the proposed improvements using this short survey.


Sidewalks and Street Crossings

Review the proposed improvements for wider sidewalks, improved pedestrian crossings and missing connections.

Sidewalks and street crossings designs

You can provide feedback on the proposed improvements or suggest new locations for improvements on this interactive map.


Driving and Intersections

Review the proposed traffic direction changes and intersection improvements.

Driving and intersections designs

You can provide feedback on the proposed improvements using this short survey


Parks and Open Spaces

Review the proposed improvements to area parks and open spaces.

Parks and open spaces designs

You can provide feedback and share your ideas on the proposed improvements by clicking on the following links:


Boyle Street & McCauley Neighbourhood Renewal - Options and Tradeoffs

Engagement has concluded. Thank you for providing your feedback. 

Neighbourhood design options are taking shape! Share your thoughts!

We have many proposed design options that will change the way you move through your neighbourhood. Please provide feedback on those that interest you.


NEW! Bike Network Connections and Street Changes (posted September 1, 2021)

Review the proposed NEW design options for bike routes and street changes, along with their benefits and tradeoffs, and provide your feedback through our online survey until September 30, 2021.

These new designs include options for the following:

Bike Network Connections; 108 Avenue and 108A Avenue (92 to 96 Street); 92 Street (103A to 111 Avenue); 96 Street (105 to 111 Avenue); 98 Street (105 to 110A Avenue); 99 Street (106 to 108A Avenue)


Online Event

Watch the video from our September 14 online event to learn more about the newest design options.



If you have not yet reviewed and commented on the following design options posted July 2021, please consider doing so before September 30, 2021:


Active Transportation and Alley Connections

Review the proposed improvements to active transportation connections and Chinatown's alleys.

Active transportation and alley connections design

You can provide feedback on the proposed improvements using this short survey.


Sidewalks and Street Crossings

Review the proposed improvements for wider sidewalks, improved pedestrian crossings and missing connections.

Sidewalks and street crossings designs

You can provide feedback on the proposed improvements or suggest new locations for improvements on this interactive map.


Driving and Intersections

Review the proposed traffic direction changes and intersection improvements.

Driving and intersections designs

You can provide feedback on the proposed improvements using this short survey


Parks and Open Spaces

Review the proposed improvements to area parks and open spaces.

Parks and open spaces designs

You can provide feedback and share your ideas on the proposed improvements by clicking on the following links:


This online engagement is now closed.

You can:

  • Ask a question directly to the Boyle Street & McCauley Neighbourhood Renewal project team.

  • Search and view community-submitted questions and official responses.

  • Type your question into the box below and click “Submit”. Answers are provided within five to seven business days of receipt.

  • Is there an opportunity to bring in traffic calming measures on 93 street between 107a Ave and 108 Ave? The street is quite wide and is used to avoid the traffic lights at 92 street. There is no Boulevard to provide a buffer between traffic and the sidewalk and there are a number of small children living in the area. Thanks

    SKelly asked over 2 years ago

    The project team will investigate. Thank you for identifying a need. If it is possible it will be shown in the updated design in early 2022.

  • One of your recent messages mentioned a survey being available about Options and TradeOffs; however, when I followed the link the only option was an online live event when I am on vacation. Please clarify the engagement opportunity. Thank you.

    Audrey asked over 2 years ago

    Please go to the project page at https://www.edmonton.ca/transportation/on_your_streets/boyle-street-mccauley and click on the large blue button (box) that reads Engaged Edmonton. Once you are on the Engaged Edmonton page there is a large green button that says "tell us what you think?" that is the online survey.

  • Does this mean the Quarters redevelopment plan is no longer being used?

    Ranger asked over 2 years ago

    Thanks for your question.

    No. In fact, the Neighbourhood Renewal Team is coordinating with the Quarters Project Team to implement portions of the Quarters Urban Design Plan where possible. We are also working collaboratively with Revitalization and many other City and Community Projects in the neighbourhoods.