LDA21-0083 City Planning Framework - Plan Repeals

Consultation has concluded

Thank you for visiting.


Phase One discussion has concluded and the What We Heard Report is posted and available.


The Phase One LDA was approved at Council on June 8th, 2021. Thank you to all those who provided feedback.

For more information on the project, please visit the City Planning Framework webpage.



New direction from The City Plan has highlighted a need to review our current land use plans and begin the careful process of repealing plans that have fulfilled their purpose. This work is being undertaken through the first phase of the City Planning Framework Implementation project. This is the first time the City has undertaken a broad review of over 200 land use plans in effect, many of which have fulfilled their purpose and helped shape our city.


Please watch the video and review the information on this page. The video is 8 minutes and covers the following:

What is being proposed (0:00)
Why the work is being done (3:17), and
How to provide feedback through the page's tools (6:54).

Tell us what you think using the Interactive Map Tool below and ask any questions in the Questions Tool below, before the end of the day on April 5, 2021.




The purpose of the proposed repeals is to remove land use plans that have fulfilled their purpose and are no longer needed to provide direction in the identified communities. The review process will assess this omnibus land development application and involves a Public Hearing process.


It is important to note that any plans that City Council repeals as part of this LDA process will not be removed from the City's web site. Instead, they will be archived for historical reference on a webpage for repealed plans but will not longer have statutory standing or provide guidance on Council or Administration decisions.


The repeals are primarily an administrative function based on whether plans have fulfilled their intended purpose as a land use plan. Policy is not changing or shifting.

This land development application proposes the following:

The plans proposed for repeal were carefully reviewed and found to have fulfilled their intended purpose based on one or more of the following criteria:


  • Plans are no longer advancing their intended purpose, i.e. to guide the orderly development of new land (greenfield) including infrastructure and land-use zoning
  • The City's planning approach, needs, and direction have evolved over time
  • The implementation of recent planning documents provide updated policy direction for an area
  • Plans are beyond their intended time horizon

Feedback from Edmontonians is being collected until April 5, 2021. All feedback collected through the Interactive Map Tool and the Questions Tool will be compiled into a What We Heard report in preparation for Public Hearing.

Thank you for visiting.


Phase One discussion has concluded and the What We Heard Report is posted and available.


The Phase One LDA was approved at Council on June 8th, 2021. Thank you to all those who provided feedback.

For more information on the project, please visit the City Planning Framework webpage.



New direction from The City Plan has highlighted a need to review our current land use plans and begin the careful process of repealing plans that have fulfilled their purpose. This work is being undertaken through the first phase of the City Planning Framework Implementation project. This is the first time the City has undertaken a broad review of over 200 land use plans in effect, many of which have fulfilled their purpose and helped shape our city.


Please watch the video and review the information on this page. The video is 8 minutes and covers the following:

What is being proposed (0:00)
Why the work is being done (3:17), and
How to provide feedback through the page's tools (6:54).

Tell us what you think using the Interactive Map Tool below and ask any questions in the Questions Tool below, before the end of the day on April 5, 2021.




The purpose of the proposed repeals is to remove land use plans that have fulfilled their purpose and are no longer needed to provide direction in the identified communities. The review process will assess this omnibus land development application and involves a Public Hearing process.


It is important to note that any plans that City Council repeals as part of this LDA process will not be removed from the City's web site. Instead, they will be archived for historical reference on a webpage for repealed plans but will not longer have statutory standing or provide guidance on Council or Administration decisions.


The repeals are primarily an administrative function based on whether plans have fulfilled their intended purpose as a land use plan. Policy is not changing or shifting.

This land development application proposes the following:

The plans proposed for repeal were carefully reviewed and found to have fulfilled their intended purpose based on one or more of the following criteria:


  • Plans are no longer advancing their intended purpose, i.e. to guide the orderly development of new land (greenfield) including infrastructure and land-use zoning
  • The City's planning approach, needs, and direction have evolved over time
  • The implementation of recent planning documents provide updated policy direction for an area
  • Plans are beyond their intended time horizon

Feedback from Edmontonians is being collected until April 5, 2021. All feedback collected through the Interactive Map Tool and the Questions Tool will be compiled into a What We Heard report in preparation for Public Hearing.

  • CLOSED: This survey has concluded.

    The Abbottsfield Rundle Heights Community Development Plan (CDP) has been considered to have fulfilled its purpose in the following ways:

    Over the past 50 years, the City has made use of a variety of planning tools. Some of these planning tools have been selected for repeal based on a combination of factors, including the extent to which they have fulfilled their originally intended purpose; the age of the plan and where indicated, their associated planning horizon; and the completion of other neighbourhood plans within the subject areas which provide further direction for neighbourhood development.neighbourhood plans within the subject areas which provide further direction for neighbourhood development.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Alberta Avenue / Eastwood Area Redevelopment Plan (ARP) has been considered to have fulfilled its purpose in the following ways:

    ARPs reflect the planning principles and redevelopment priorities of the day. In many cases, priorities and best planning practices have evolved since plans were written. Infrastructure funding programs in place when plans were written may have long since ended. Regulations (e.g. zoning categories) referred to in the plans no longer exist. In some cases, more current planning tools have been prepared to guide planning and development decisions for the area. 

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Aldergrove Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Belle Rive Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Belmead Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Blackburne Neighbourhood Area Structure Plan (NASP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the  NASP has provided all necessary guidance for the orderly development of the land. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NASP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Blackmud Creek Neighbourhood Area Structure Plan (NASP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the  NASP has provided all necessary guidance for the orderly development of the land. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NASP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Bonaventure Outline Plan (OP) has been considered to have fulfilled its purpose in the following ways:

    Outline plans were a planning tool used in the 1960s and 1970’s to guide greenfield development in neighbourhoods long since built out. These plans are no longer required as the residential areas have been developed, infrastructure has been provided and transportation within the neighbourhood is well established. Outline plans are also no longer provided for in Alberta’s enabling legislation, the Municipal Government Act.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Brintnell Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Bulyea Heights Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Burnewood Neighbourhood Area Structure Plan (NASP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the  NASP has provided all necessary guidance for the orderly development of the land. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NASP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Calder Neighbourhood Implementation Plan (NIP) has been considered to have fulfilled its purpose in the following ways:

    Over the past 50 years, the City has made use of a variety of planning tools. Some of these planning tools have been selected for repeal based on a combination of factors, including the extent to which they have fulfilled their originally intended purpose; the age of the plan and where indicated, their associated planning horizon; and the completion of other neighbourhood plans within the subject areas which provide further direction for neighbourhood development.neighbourhood plans within the subject areas which provide further direction for neighbourhood development.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Carter Crest Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Castle Downs Outline Plan (OP) has been considered to have fulfilled its purpose in the following ways:

    Outline plans were a planning tool used in the 1960s and 1970’s to guide greenfield development in neighbourhoods long since built out. These plans are no longer required as the residential areas have been developed, infrastructure has been provided and transportation within the neighbourhood is well established. Outline plans are also no longer provided for in Alberta’s enabling legislation, the Municipal Government Act.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Chambery Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Clareview Outline Plan (OP) has been considered to have fulfilled its purpose in the following ways:

    Outline plans were a planning tool used in the 1960s and 1970’s to guide greenfield development in neighbourhoods long since built out. These plans are no longer required as the residential areas have been developed, infrastructure has been provided and transportation within the neighbourhood is well established. Outline plans are also no longer provided for in Alberta’s enabling legislation, the Municipal Government Act.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Coliseum Station Area Redevelopment Plan (ARP) has been considered to have fulfilled its purpose in the following ways:

    ARPs reflect the planning principles and redevelopment priorities of the day. In many cases, priorities and best planning practices have evolved since plans were written. Infrastructure funding programs in place when plans were written may have long since ended. Regulations (e.g. zoning categories) referred to in the plans no longer exist. In some cases, more current planning tools have been prepared to guide planning and development decisions for the area. 

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Cromdale / Virginia Park Area Redevelopment Plan (ARP) has been considered to have fulfilled its purpose in the following ways:

    ARPs reflect the planning principles and redevelopment priorities of the day. In many cases, priorities and best planning practices have evolved since plans were written. Infrastructure funding programs in place when plans were written may have long since ended. Regulations (e.g. zoning categories) referred to in the plans no longer exist. In some cases, more current planning tools have been prepared to guide planning and development decisions for the area. 

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Cumberland Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Dechene Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Duggan Neighbourhood Area Structure Plan (NASP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the  NASP has provided all necessary guidance for the orderly development of the land. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NASP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Dunvegan Area Structure Plan (ASP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the ASP has provided all necessary guidance for the orderly development of the land, it has served its purpose. The plan does not provide guidance for community change after that point. Any proposed land use changes after its neighbourhoods are built out must look to policies within the Municipal Development Plan, guidelines and best practices to be assessed for their recommendation to council. At this point the ASP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Elsinore Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Falconer Heights Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Groat Estate Implementation Plan (IP) has been considered to have fulfilled its purpose in the following ways:

    Over the past 50 years, the City has made use of a variety of planning tools. Some of these planning tools have been selected for repeal based on a combination of factors, including the extent to which they have fulfilled their originally intended purpose; the age of the plan and where indicated, their associated planning horizon; and the completion of other neighbourhood plans within the subject areas which provide further direction for neighbourhood development.neighbourhood plans within the subject areas which provide further direction for neighbourhood development.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Haddow Neighbourhood Area Structure Plan (NASP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the  NASP has provided all necessary guidance for the orderly development of the land. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NASP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Henderson Estates Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Heritage Valley Servicing Concept Design Brief (SCDB) has been considered to have fulfilled its purpose in the following ways:

    Over the past 50 years, the City has made use of a variety of planning tools. Some of these planning tools have been selected for repeal based on a combination of factors, including the extent to which they have fulfilled their originally intended purpose; the age of the plan and where indicated, their associated planning horizon; and the completion of other neighbourhood plans within the subject areas which provide further direction for neighbourhood development.neighbourhood plans within the subject areas which provide further direction for neighbourhood development.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Hermitage Outline Plan (OP) Central / East Neighbourhoods has been considered to have fulfilled its purpose in the following ways:

    Outline plans were a planning tool used in the 1960s and 1970’s to guide greenfield development in neighbourhoods long since built out. These plans are no longer required as the residential areas have been developed, infrastructure has been provided and transportation within the neighbourhood is well established. Outline plans are also no longer provided for in Alberta’s enabling legislation, the Municipal Government Act.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Highlands Neighbourhood Planning Study (PS) has been considered to have fulfilled its purpose in the following ways:

    Over the past 50 years, the City has made use of a variety of planning tools. Some of these planning tools have been selected for repeal based on a combination of factors, including the extent to which they have fulfilled their originally intended purpose; the age of the plan and where indicated, their associated planning horizon; and the completion of other neighbourhood plans within the subject areas which provide further direction for neighbourhood development.neighbourhood plans within the subject areas which provide further direction for neighbourhood development.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Hodgson Neighbourhood Area Structure Plan (NASP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the  NASP has provided all necessary guidance for the orderly development of the land. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NASP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Jamieson Place Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Kaskitayo Outline Plan (OP) has been considered to have fulfilled its purpose in the following ways:

    Outline plans were a planning tool used in the 1960s and 1970’s to guide greenfield development in neighbourhoods long since built out. These plans are no longer required as the residential areas have been developed, infrastructure has been provided and transportation within the neighbourhood is well established. Outline plans are also no longer provided for in Alberta’s enabling legislation, the Municipal Government Act.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Keheewin Neighbourhood Area Structure Plan (NASP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the  NASP has provided all necessary guidance for the orderly development of the land. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NASP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Kernohan Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Kirkness Outline Plan (OP) has been considered to have fulfilled its purpose in the following ways:

    Outline plans were a planning tool used in the 1960s and 1970’s to guide greenfield development in neighbourhoods long since built out. These plans are no longer required as the residential areas have been developed, infrastructure has been provided and transportation within the neighbourhood is well established. Outline plans are also no longer provided for in Alberta’s enabling legislation, the Municipal Government Act.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Lago Lindo Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Leger Neighbourhood Area Structure Plan (NASP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the  NASP has provided all necessary guidance for the orderly development of the land. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NASP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The LaPerle Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Lymburn Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The MacEwan Neighbourhood Area Structure Plan (NASP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the  NASP has provided all necessary guidance for the orderly development of the land. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NASP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Magrath Heights Neighbourhood Area Structure Plan (NASP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the  NASP has provided all necessary guidance for the orderly development of the land. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NASP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Matt Berry Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Mayliewan Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The McLeod East Neighbourhood Area Structure Plan (NASP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the  NASP has provided all necessary guidance for the orderly development of the land. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NASP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The McLeod West Neighbourhood Area Structure Plan (NASP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the  NASP has provided all necessary guidance for the orderly development of the land. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NASP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Montrose / Santa Rosa Area Redevelopment Plan (ARP) has been considered to have fulfilled its purpose in the following ways:

    ARPs reflect the planning principles and redevelopment priorities of the day. In many cases, priorities and best planning practices have evolved since plans were written. Infrastructure funding programs in place when plans were written may have long since ended. Regulations (e.g. zoning categories) referred to in the plans no longer exist. In some cases, more current planning tools have been prepared to guide planning and development decisions for the area. 

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Miller Neighbourhood Area Structure Plan (NASP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the  NASP has provided all necessary guidance for the orderly development of the land. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NASP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Mill Woods Development Concept Plan has been considered to have fulfilled its purpose in the following ways:

    Over the past 50 years, the City has made use of a variety of planning tools. Some of these planning tools have been selected for repeal based on a combination of factors, including the extent to which they have fulfilled their originally intended purpose; the age of the plan and where indicated, their associated planning horizon; and the completion of other neighbourhood plans within the subject areas which provide further direction for neighbourhood development.neighbourhood plans within the subject areas which provide further direction for neighbourhood development.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The North Glenora Community Plan (CP) has been considered to have fulfilled its purpose in the following ways:

    Over the past 50 years, the City has made use of a variety of planning tools. Some of these planning tools have been selected for repeal based on a combination of factors, including the extent to which they have fulfilled their originally intended purpose; the age of the plan and where indicated, their associated planning horizon; and the completion of other neighbourhood plans within the subject areas which provide further direction for neighbourhood development.neighbourhood plans within the subject areas which provide further direction for neighbourhood development.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Northlands Area Redevelopment Plan (ARP) has been considered to have fulfilled its purpose in the following ways:

    ARPs reflect the planning principles and redevelopment priorities of the day. In many cases, priorities and best planning practices have evolved since plans were written. Infrastructure funding programs in place when plans were written may have long since ended. Regulations (e.g. zoning categories) referred to in the plans no longer exist. In some cases, more current planning tools have been prepared to guide planning and development decisions for the area. 

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Norwood Neighbourhood Implementation Plan (NIP) has been considered to have fulfilled its purpose in the following ways:

    Over the past 50 years, the City has made use of a variety of planning tools. Some of these planning tools have been selected for repeal based on a combination of factors, including the extent to which they have fulfilled their originally intended purpose; the age of the plan and where indicated, their associated planning horizon; and the completion of other neighbourhood plans within the subject areas which provide further direction for neighbourhood development.neighbourhood plans within the subject areas which provide further direction for neighbourhood development.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Ogilvie Ridge Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Ormsby Place Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Oxford Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Ozerna Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Parkallen Community Development Plan (CDP) has been considered to have fulfilled its purpose in the following ways:

    Over the past 50 years, the City has made use of a variety of planning tools. Some of these planning tools have been selected for repeal based on a combination of factors, including the extent to which they have fulfilled their originally intended purpose; the age of the plan and where indicated, their associated planning horizon; and the completion of other neighbourhood plans within the subject areas which provide further direction for neighbourhood development.neighbourhood plans within the subject areas which provide further direction for neighbourhood development.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Parkdale Area Redevelopment Plan (ARP) has been considered to have fulfilled its purpose in the following ways:

    ARPs reflect the planning principles and redevelopment priorities of the day. In many cases, priorities and best planning practices have evolved since plans were written. Infrastructure funding programs in place when plans were written may have long since ended. Regulations (e.g. zoning categories) referred to in the plans no longer exist. In some cases, more current planning tools have been prepared to guide planning and development decisions for the area. 

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Place La Rue Neighbourhood Area Structure Plan (NASP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the  NASP has provided all necessary guidance for the orderly development of the land. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NASP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Rhatigan Ridge Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Ritchie Neighbourhood Implementation Plan (NIP) / Area Redevelopment Plan (ARP) has been considered to have fulfilled its purpose in the following ways:

    ARPs reflect the planning principles and redevelopment priorities of the day. In many cases, priorities and best planning practices have evolved since plans were written. Infrastructure funding programs in place when plans were written may have long since ended. Regulations (e.g. zoning categories) referred to in the plans no longer exist. In some cases, more current planning tools have been prepared to guide planning and development decisions for the area. 

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Riverbend Area Structure Plan (ASP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the ASP has provided all necessary guidance for the orderly development of the land, it has served its purpose. The plan does not provide guidance for community change after that point. Any proposed land use changes after its neighbourhoods are built out must look to policies within the Municipal Development Plan, guidelines and best practices to be assessed for their recommendation to council. At this point the ASP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Running Creek Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The South Terwillegar Neighbourhood Area Structure Plan (NASP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the  NASP has provided all necessary guidance for the orderly development of the land. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NASP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The South Edmonton Common / Edmonton Research Development Area Structure Plan (ASP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the ASP has provided all necessary guidance for the orderly development of the land, it has served its purpose. The plan does not provide guidance for community change after that point. Any proposed land use changes after its neighbourhoods are built out must look to policies within the Municipal Development Plan, guidelines and best practices to be assessed for their recommendation to council. At this point the ASP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Southeast Area Plan has been considered to have fulfilled its purpose in the following ways:

    Over the past 50 years, the City has made use of a variety of planning tools. Some of these planning tools have been selected for repeal based on a combination of factors, including the extent to which they have fulfilled their originally intended purpose; the age of the plan and where indicated, their associated planning horizon; and the completion of other neighbourhood plans within the subject areas which provide further direction for neighbourhood development.neighbourhood plans within the subject areas which provide further direction for neighbourhood development.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Summerlea Neighbourhood Area Structure Plan (NASP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the  NASP has provided all necessary guidance for the orderly development of the land. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NASP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Summerside Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Terra Losa Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Terwillegar Heights Servicing Concept Design Brief (SCDB) has been considered to have fulfilled its purpose in the following ways:

    Over the past 50 years, the City has made use of a variety of planning tools. Some of these planning tools have been selected for repeal based on a combination of factors, including the extent to which they have fulfilled their originally intended purpose; the age of the plan and where indicated, their associated planning horizon; and the completion of other neighbourhood plans within the subject areas which provide further direction for neighbourhood development.neighbourhood plans within the subject areas which provide further direction for neighbourhood development.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Terwillegar Towne Neighbourhood Area Structure Plan (NASP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the  NASP has provided all necessary guidance for the orderly development of the land. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NASP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Webber Greens Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The Wedgewood Heights Neighbourhood Structure Plan (NSP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the NSP has provided the necessary guidance for the orderly development of the neighbourhood. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NSP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The West Jasper Place North Area Structure Plan (ASP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the ASP has provided all necessary guidance for the orderly development of the land, it has served its purpose. The plan does not provide guidance for community change after that point. Any proposed land use changes after its neighbourhoods are built out must look to policies within the Municipal Development Plan, guidelines and best practices to be assessed for their recommendation to council. At this point the ASP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The West Jasper Place Outline Plan (OP) has been considered to have fulfilled its purpose in the following ways:

    Outline plans were a planning tool used in the 1960s and 1970’s to guide greenfield development in neighbourhoods long since built out. These plans are no longer required as the residential areas have been developed, infrastructure has been provided and transportation within the neighbourhood is well established. Outline plans are also no longer provided for in Alberta’s enabling legislation, the Municipal Government Act.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The West Jasper Place South Area Structure Plan (ASP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the ASP has provided all necessary guidance for the orderly development of the land, it has served its purpose. The plan does not provide guidance for community change after that point. Any proposed land use changes after its neighbourhoods are built out must look to policies within the Municipal Development Plan, guidelines and best practices to be assessed for their recommendation to council. At this point the ASP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded
  • CLOSED: This survey has concluded.

    The York Neighbourhood Area Structure Plan (NASP) has been considered to have fulfilled its purpose in the following ways:

    Once the majority the land has been subdivided and infrastructure and zoning are in place, or where areas are undeveloped, only isolated parcels remain, the  NASP has provided all necessary guidance for the orderly development of the land. The plan does not provide guidance for community change after that point. Any proposed zoning changes after the neighbourhood is built out must look to policies within the Municipal Development Plan, Guidelines and best practices to be assessed for their recommendation to council. At this point the NASP is essentially no longer planning for future growth, but merely documenting the present conditions of the land.

    [Please click here for link to the plan]

    Consultation has concluded